4 EQUIPMENT VERSIONS

Our equipment and systems in four versions.

EVOLUTION – Our top version aims for innovation. Always with the latest available technologies and following the highest quality requirements among the world's beverage manufacturers.
ONE – Here you will find semi-automatic operations with high-level quality components and accessories.
ELEMENT – An equipment version able to fulfill your process demands with a basic level of automation & using components from the most reputed suppliers.
START – For an efficient + cost effective process demand with lower investment and manual operations. 

Mechanical

Material Piping & Process Valves

AISI 316L

Evolution

One

Element

Start


AISI 304L

Evolution

One

Element

Start

AISI 304 Frame with adjustable feet

Blasted

Evolution

One

Element

Start


Polished

Evolution

One

Element

Start

Butterfly Valves

Full Automatic

Evolution

One

Element

Start


Main Process = Automatic | Secundary Operations = Manual

Evolution

One

Element

Start


Manual

Evolution

One

Element

Start


Manual Low Cost

Evolution

One

Element

Start

Process Distribution / CIP Valves

Mixproof

Evolution

One

Element

Start


Diverter Panels with Sensors

Evolution

One

Element

Start


Sample Valves

Evolution

One

Element

Start

Electrical Automation

Valves Feedback (on/off)

Valves Feedback (on/off)

Evolution

One

Element

Start


PLC

Evolution

One

Element

Start

Operation Interface

Supervisory / HMI-PC

Evolution

One

Element

Start


HMI

Evolution

One

Element

Start


Motor Switch

Evolution

One

Element

Start


ASi NET

Evolution

One

Element

Start


Comuication Interfaces Ethernet

Evolution

One

Element

Start

Instrumentation Rating Protection

IP 69K/67

Evolution

One

Element

Start


IP 65

Evolution

One

Element

Start


IP 54

Evolution

One

Element

Start

Cabinet

AISI 304/IP 55

Evolution

One

Element

Start


Epoxi Primed/IP55

Evolution

One

Element

Start


Frequency Converters

Evolution

One

Element

Start


Software Personalization

Evolution

One

Element

Start

Quality

Inspection and Approval of Piping Welds

100%

Evolution

One

Element

Start


20%

Evolution

One

Element

Start

Material Certifications

100%

Evolution

One

Element

Start


Sensors

Evolution

One

Element

Start

Calibration Certificates for Instruments

100%

Evolution

One

Element

Start


Sensors

Evolution

One

Element

Start


GMP Construction

Evolution

One

Element

Start


Internal Chemical Passivation of Piping

Evolution

One

Element

Start


Pressure and Leakage Proofs

Evolution

One

Element

Start

Traceability

Audit: Commands, Paramenters, Users and Falts

Audit: Commands, Paramenters, Users and Falts

Evolution

One

Element

Start

Falts Reports

Falts reports

Evolution

One

Element

Start

Monitoring and Register: Corretive and Preventive

Monitoring and Register: Corretive and Preventive

Evolution

One

Element

Start

Execution Planning

Detailed Execution Planning - Task by Task

Detailed Execution Planning - Task by Task

Evolution

One

Element

Start

Instalation plan 3D for Instalation

Instalation plan 3D for instalation

Evolution

One

Element

Start

Maintenance

Preventive Maintenance: Manual and Spare Parts List

Integrated

Evolution

One

Element

Start


Integrated in the Automation System

Evolution

One

Element

Start

Corrective Maintenance: Manual and Spare Parts List

Integrated in the Automation System

Evolution

One

Element

Start


Printed Version

Evolution

One

Element

Start


Remote Acess via Internet for operation and maintenance

Evolution

One

Element

Start


Spare Parts Included

Evolution

16,000 h

One

Element

Start


Parts and Supervision: Preventive Maintenance

Evolution

1. Free

One

Element

Start


Technical Assistance by Phone or Remote Access

Evolution

One

Element

Start


1st year - 24h/7d

Evolution

One

Element

Start


1st year - Working Time (Germany)

Evolution

One

Element

Start

Operational Security

Users Acess Levels

Users Acess Levels

Evolution

One

Element

Start

Typ of Acess

Typ of Acess

Evolution

RFID

One

Password

Element

Start

Data Monitoring

Ingredients, Consumables Consumption

Ingredients, Consumables Consumption

Evolution

One

Element

Start

Utilities Consumption (water, steam, energy ...)

Utilities Consumption (water, steam, energy...)

Evolution

One

Element

Start

Production

Production

Evolution

One

Element

Start

Garanty

Garanty

Month

Evolution

24

One

12

Element

12

Start

12

Training

Training

Process and Operation

Evolution

4

One

1

Element

Start


Topics for Maintenance

Evolution

2

One

Element

Start


Training for supervisors

Evolution

1

One

1

Element

Start

Documentation

Process Distribution / CIP Valves

Detailled 3D Equipment Drawing

Evolution

100%

One

Element

Start


3D Installation Drawings

Evolution

100%

One

Element

Start


Instalation Layout and P&D

Evolution

One

Element

Start


Equipment Layout and P&D

Evolution

One

Element

Start


Reports of Regulations Applied

Evolution

One

Element

Start


Operation Manual

Evolution

One

Element

Start

Possible upgrades

Available Superior Versions for Upgrade

Available Superior Versions for Upgrade

Evolution

One

Evolution

Element

One/Evolution

Start

ADDRESS


E2PS GmbH
Eigelstein 103 – 113
50668 Cologne | Germany

CONTACT


PHONE + 49 221 8017 7819
EMAIL This email address is being protected from spambots. You need JavaScript enabled to view it.